The Shop Floor Control Problem in Automated Manufacturing Systems : Determination of Machining Speed with Due Date of Parts

자동생산체제의 작업장운영문제에서 부품의 납기를 고려한 가공속도 결정

  • 노인규 (한양대학교 산업공학과) ;
  • 박찬웅 (한양대학교 산업공학과)
  • Published : 1996.09.01

Abstract

The breakdown of machines lead to the lateness of parts and the change of schedules. Its treatment is very important problem in the shop floor control system. In this study, we present an algorithm minimize the lateness, earliness and change of schedule by controlling machining speed of available machines. Production time and production cost required to manufacture a piece of product are usually expressed as a unimodal convex fuction with respect to machining speed, and each has its minimal point at the minimum time speed or the minimum cost speed, and a speed range between these two speeds is called 'efficiency speed range'. Therefore, the algorithm determines the machining speed in the efficiency speed range. An example is demonstrated to explain the algorithm.

Keywords