References
- 한국경영과학회지 v.17 no.3 작업 일정계획문제 해결을 위한 유전알고리듬의 응용 김석준;이채영
- Preceedings of The 21st KISS Fall Conference v.21 no.2 유전 알고리즘을 이용한 자동차 부품공장의 작업 일정계획 수립 류광렬;박성훈;김갑환;홍봉희
- ICGA-93 Conference Direct Chromosome Representation and Advanced Genetic Operators for Production Scheduling Bruns, R
- Proceedings of The 24th North American Manufacturing Research Conference Computer Aided Process Planning System for Block Assembly Shop Using CBR Cho, K. K(et al.)
- ICGA-93 Conference A promising Genetic Algorithm Approach to Jop-Shop Scheduling Problems Fang, H;Ross, P;Corne, D
- Genetic Algorithms in Search, Optimization & Machine Learning Goldberg, D.E
- A Users Guide to GAucsd 1.4 Grefenstette, J.J;N. N. Schraudolph
- Adaptation in Natural and Artificial Systems Holland, J.H
- AI Magazine v.16 no.4 Intelligent Scheduling Systems for Shipbuilding Lee, J. K(et al.)