POWER MANAGEMENT ANALYSIS FOR KITSAT-1

우리별 1호의 전력 운용 관리 분석

  • 구자춘 (한국과학기술원 인공위성연구센터) ;
  • 이임평 (한국과학기술원 인공위성연구센터) ;
  • 최순달 (한국과학기술원 인공위성연구센터) ;
  • 윤명중 (한국과학기술원 전기 및 전자공학과) ;
  • 최재동 (한국항공우주연구소)
  • Published : 1996.06.01

Abstract

Provision of the electrical power generated from solar array is one of the most fundamental requirements for the spacecraft payloads. Power subsystem collects, regulates and distributes power to the experiment payloads and to the various spacecraft subsystem. In this paper, the analysis result of the KITSAT-1 WOD shows that the in-orbit operation of whole power system has been in good condition.

Keywords