Abstract
The existing gate operation rule of Paldang hydroelectric plant has been used since the construction of the dam in 1973 except partial modification due to the construction of Chungju multipurpose dam in 1985. The water level near the downstream of Paldang dam has been lowered about 3 m because of the channel maintenance of Han River development project. Thus, the discharge estimation formula based on the submerged orifice type spillway has to be re-evaluated by considering various patterns of the gate operation rules and lowered channel bed. In this study, three types of gate openings were tested to select the proper gate operation rules through the hydraulic model test for various discharges and opening heights. Also, the numerical analysis has been performed to simulate the flow patterns of downstream. As a result, the gate operation rule, which opens 5 gates each time from the left side, was selected as the proper gate operation rule of Paldang dam.
1973년 팔당 수력발전소 준공 이래로 사용하여 온 수문조작기준은, 1985년 충주 다목적댐 건설에 따른 한강홍수예경보 프로그램 개선에 따라 일부 수정을 거쳐 사용하고 있다. 그 동안 한강 종합개발 사업의 하도정비사업결과로 팔당댐 하류지역의 수면저하가 가시적으로 발생하게 되었다. 이로 인해 댐 건설당시의 낙차에 변화가 생겼고 댐하류부의 수위가 평균 3m 정도 저하되어 잠수 오리피스식 여수로인 팔당댐의 방류량 산정식에 문제점이 발생하면서 수문개방방식별 방류량의 재산정이 불가피해졌다. 본 연구에서는, 이러한 문제점을 해결하고 수문조작기준을 결정하기 위하여 수리모형실험을 통해 세가지 수문조작 방식을 비교, 검토하였다. 댐우안에 위치한 발전소 설비 및 운영에 영향을 미치지 않는 안전범위를 최우선으로 하여 방류량별, 개도형태별로 하류부에서의 유황을 관찰하였으며, 또한 수치모형으로도 하류부유황을 모의하여 검토한 결과, 좌측 수문 5개씩을 순차적으로 개방하는 방식을 가장 적절한 수문조작기준으로 결정하였다.