기계 고장을 고려한 생산 및 품질검증 정책

Lot Sizing and Quality Inspection Schedules with Machine Breakdown

  • 발행 : 1996.12.01

초록

This paper addresses the effects of an imperfect production process on the optimal production quantity and quality inspection policies. The system is assumed to deteriorate during the production process. The result are either the production of a number of defective items or the breakdown of the production meachine. A simple rule has been suggested to determine whether multiple quality in spection is workth or not. Furthermore, when multiple inspection policy is adopted, the optimal in spection schedule is shown to be equally spaced throughout the production cycle. Exact solution and approximation of the optimal production quantity and approximation of the optimal number of inspection are provided. Finally , to better understand the model of this paper, comparisons between this model and classical EMQ model are provided.

키워드

참고문헌

  1. 산업공학회지 v.20 no.3 안정화기간을 고려한 최적생산량의 결정 함주호;김승한;이건호
  2. Oper. Res. v.36 Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems Bielecki,T.;Kumar,P.R.
  3. European Journal of Oper. Res. v.42 Lot Sizes and Setup Frequency with Learning in Setups and Process Quality Chand,S.
  4. European Journal of Oper. Res. v.39 An Economic Production Quantity Model with Flexibility and Reliability Consideration Cheng,T.C.E.
  5. Management Sci. v.23 Economic Design of np Charts for Processes subject to a Multiplicity of Assignable Causes Chiu,W.K.
  6. Oper. Res. v.37 Dynamic Process Improvement Fine,C.H.;Porteus,E.
  7. Management Sci. v.38 Production Lot Sizing with Machine Breakdown Groenevelt,H.;Pintelon,L.;Seidmann,A.
  8. Oper. Res. v.40 Production Batching with Machine Breakdowns and Safety Stocks Groenevelt,H.;Pintelon,L.;Seidmann,A.
  9. Naval Res. Logist. v.35 Production Lot Sizing Under Setup and Worker Learning Karwan,K.R.;Mazzola,J.B.;Morey,R.C.
  10. Management Sci. v.33 Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System Lee,H.L.;Rosenblatt,M.J.
  11. IIE Trans. v.21 A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay Lee,H.L.;Rosenblatt,M.J.
  12. Oper. Res. v.38 Inventory Models with Cost Change Lev,B.;Weiss,H.J.
  13. Management Sci. v.29 Learning Effects in Economic Lot Sizing Muth,E.J.;Spremann,K.
  14. Management Sci. v.33 Warnings of Malfunction: The Decision to Inspection and Maintain Production Processes on Schedule or on Demand Pate-Cornell,M.E.;Lee,H.L.;Tagaras,G.
  15. Management Sci. v.31 Investing in Reduced Setups In EOQ Model Porteus,E.
  16. Oper. Res. v.34 Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction Porteus,E.
  17. Management Sci. v.36 The Impact of Inspection Delay on Process and Inspection Lot sizing Porteus,E.
  18. IIE Trans. v.18 A Comparative Study of Continuous and Periodic Inspection Policies in Deteriorating Production Systems Rosenblatt,M.J.;Lee,H.L.
  19. IIE Trans. v.18 Economic Production Cycle with Imperfect Production Process Rosenblatt,M.J.;Lee,H.L.
  20. European Journal of Oper. Res. v.59 Optimal Ordering Policies When Anticipating a disruption in supply or demand Weiss,H.J.;Rosenthal,E.C.
  21. Naval Res. Logist v.36 Lot Sizes Under Continuous Demand: The Back order Case Yao,D.;Klein,M.