Coordinating Production Order and Scheduling Policy under Capacity Imbalance

  • Published : 1996.08.01

Abstract

This paper comes from an observation that overemphasis on capacity utilization meausre, which is usual under capacity shortage, can seriously hurt the firm's profit and potential process improvement. We suggest a model that can be used in designing a coordination scheme for decentralized marketing and manufacturing activities. Using a price and time-sensitive demand and capacitated lotsizing model, we derive an effective communication medium betwen marketing and manufacturing. This Balance Indicator of process capacity and flexibility also implies that the increase in capacity availability and setup time reduction should be balanced by its market requirements. This is particularly important when a firm tries to improve its process capability by kaizen. Further, the model can be used to show the comparative performances of scheduling policies under capacity imbalnce. We show the shortening the scheduling cycle can improve the firm profit without changing the simple scheduling rule.

Keywords

References

  1. European Journal of Operational Research v.74 Throughput Analysis in Manufacturing Networks Bitran,G.R.;D.Sakar
  2. European Journal of Operational Research v.75 Flexibility and Product Variety in Lot-sizing Models de Groote,X.
  3. International Journal of Production Economics v.36 Flexibility and Marketing/Manufacturing Coordination de Groote,X.
  4. The Engineering Economist v.36 New System for Measurement and Control Kaplan,R.S.
  5. Harvard Business Review The Balanced Scorecard-Measures That Drive Performance Kaplan,R.S.;D.P.Norton
  6. Management Science v.33 Lot Sizes, Lead Times and In-Process Inventories Karmarkar,U.S.
  7. Journal of Manufacturing Operations Management v.2 Capacity Loading, Release Planning and Master Scheduling with WIP and Lead Times Karmarkar,U.S.
  8. Logistics of Production and Inventory Manufacturing Lead Times Karmarkar,U.S.;S.C.Graves(ed.);A.H.G. Rinnoy Kan(ed.);P.H.Zipkin(ed.)
  9. Management Science v.33 Setup Reduction and Increased Effective Capacity Spence,A.M.;E.L.Porteus