Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Keywords

References

  1. 에너지경제연구원 기후변화협약 체결과 에너지부문의 과제 김진오
  2. 에너지경제연구원 2000년대를 향한 장기전력 정책방향 연구 에너지경제연구원
  3. 서울대학교 박사학위 논문 옥동석
  4. 한국과학기술원 원자력과 유연탄발전의 경제성 분석기법 확립에 관한 연구 한국과학기술원
  5. 한국과학기술원 우리나라 산업정책의 새로운 패러다임 한국과학기술원
  6. 한국산업경제연구원 수력발선소의 경제성평가방법연구 한국산업경제연구원
  7. 한국수자원공사 요금업무관련법령집 한국수자원공사
  8. 한국수자원공사 다목적댐 수력발전의 경제성 평가 및 전력요금 산정방안에 관한 연구 한국수자원공사
  9. 한국전력공사 구입전력의 적정수준과 요율에 관한 연구 한국전력공사
  10. Energy Policy Avoided-Cost Pricing of Electricity from Waste-to-Energy Plants Allen L.White;Marie Zack
  11. Journal of Public Economics v.33 Pricing Cogenerated Electricity and Heat in Local Communities Bohman,M.;R.Andersson
  12. Markets or Governments:Choosing between Imperfect Alternatives Charles Wolf,Jr.
  13. Engineering and Design:Hydropower Department of the Army Corps Engineers Office of the Chief of Engineerings
  14. Energy Systems and Policy v.11 PURPA 210 Avoided Cost Rats: Economic and Implementation Issues Devine,M.D.;M.A.Chartock;E.M.Gunn;D.A.Huettner
  15. Resources and Energy v.9 Optimal Pricing of Utility Power Purchases from Qualifying Facilities Einhorn,M.A.
  16. Resources and Energy v.12 The Electic Utility Industry: New Challenges and Old Questions Geddes,R.R.;P.H.Griffes
  17. The Energy Journal v.11 no.2 The Efficient Design of Contracts to Purchase Cogenerated Power Hall,E.C.;John,W.Parsons
  18. IEEE Transactions on Power Apparatus and Systems PURPA, New Horizon for Electric Utilities and Industry Harkins,H.L.
  19. American Economic Review v.56 no.3 Allocative Efficiency Versus X-Efficiency Harvey Liebenstein
  20. Utilities Policy Contracting for Non-Utility Generation Hulkower,S.D.
  21. The Energy Journal v.11 no.1 On the Economics of Cogeneration:Pricing and Efficiency in Government Owned Utilities Kim,Jae-Cheol;Byong-Hun Ahn
  22. Negotiating Rationally Max,H.Bazerman;Margaret,A.Neale
  23. The Journal of Energy and Development v.12 no.2 Electric Utility Competition:Lessons from Others Munroe,T.
  24. Review of Economic Studies v.58 Incomplete Contracts, Specific Investments, and Risk Sharing Tai Yeong, Jung
  25. Report on Avoided Capacity Costs Texas Study Group on Cogeneration