A Heuristic for Scheduling Production of Components at a Single Facility

단일설비 생산체제에서 부품의 일정계획에 관한 발견적 기법

  • 김봉진 (단국대학교 산업공학과)
  • Published : 1994.06.30

Abstract

We consider a single-machine scheduling problem dealing with the manufacture of components for subsequent assembly into end products. Each product requires both unique components and common components, and each production requires a setup. By making some assumptions on the data and the availability of the components for assembly, Baker provides on efficient dynamic programming algorithm for obtaining the optimal schedule. In this paper we do not impose any requirement on the data, and we solve the more complicated batching and sequencing problem. We suggest a simple heuristic method that is efficient and finds solutions that are optimal or close to the optimal solution.

Keywords

Acknowledgement

Supported by : 한국과학재단