A Statistical Review on States Relating to Operation of Radiotherapy Equipments in Seoul National University Hospital

서울대학교병원의 방사선치료장비 운용 통계에 관한 고찰

  • Park, Heung-Deuk (Dept. of Therapeutic Radiology, Seoul National University Hospital) ;
  • Kim, Wan-Sun (Dept. of Therapeutic Radiology, Seoul National University Hospital) ;
  • Ahn, Hee-Yong (Dept. of Therapeutic Radiology, Seoul National University Hospital)
  • 박흥득 (서울대학교병원 치료방사선과) ;
  • 김완선 (서울대학교병원 치료방사선과) ;
  • 안희용 (서울대학교병원 치료방사선과)
  • Published : 1994.11.01

Abstract

To analyze the states of operation of radiotherapy facilities in the period from 1979 to 1992 and to get the base for efficient operation and maintenance of the radiotherapy facilities. Data on the records of annual number of patients operated by each facility; span of suspension of operation, the cost and span of repairing, and parts of oui-of-order in the period from 1979 to 1992 were analyzed. We made a comparative analysis of average annual number of patients, annual span of the suspension of operation, annual cost ratio of repair, span of repairing per break down, and total number of broken parts. We could get following annual number of patients(day), span of the suspension of span ($\%$)(day). annual cost ratio fo repair($\%$), span of repairing per break down(Min-Max, day), and number of broken parts from this analysis. 1. Cobalt unit (Picker C-9) : 10,389(43), 0.4(0.83) 0.07, 1hr-2, 3 2. Linac(Clinac 6/100) : 11,492(50), 4.0(9.57), 0.98, 1hr-30, 12 3. Linac(Clinac 18) : 9.115(44), 12.7(30.5), 3.54, 1hr-108. 41 4. Simulator(Picker Ther-X) : 2,017(9), 0.51(1.3), 0.24, 1hr-2, 7 5. RTP(Capentec Cap-plan) : 528(2), 0.4(0.93), - hrs, - The conclusion obtained from statistical analysis above are as follows. 1. The rate of operation of Cobalt unit($99.6\%$) was higher that of Linear Accelerators ($87.3\%$). The rates operation of Simulator and RTP computer were very close to that of Cobalt unit. 2. In order to raise up the working ratio of accelerator. it is desirable that we keep our engineer to learn a sufficient technical skill and the equipment agent to stock sufficient spare parts. 3. In order to maintain Linear Accelerator efficiently, it is desirable to have annually $2.3\%$ of the purchase price of equiment for repairing.

Keywords