A Study on the Optimal Replacement Periods of Digital Control Computer's Components of Wolsung Nuclear Power Plant Unit 1

월성 원자력 발전소 1호기의 디지탈 제어컴퓨터 부품들의 최적교체주기에 관한연구

  • Published : 1993.09.01

Abstract

Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models for optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference.

원자력 발전소의 제어계측 장비의 노후화 때문에, 원자력 발전소에서는 제어계측 장비의 고장으로 인한 발전소 불시정지가 가끔 일어난다. 원자력 발전소의 불시정지는 커다란 경제적 손실과 발전소의 신뢰도를 떨어뜨리고 대중적인 인식을 좋지 않게 한다. 그러므로 불필요한 불시정지를 방지하기 위해서 제어계측 부품의 노후화를 고려한 부품교체를 해주는 것이 필요하다. 이 논문은 월성 원자력 발전소의 제어 컴퓨터 부품의 최적교체주기에 대해 연구했다. 우리는 먼저 월성 디지탈 제어 컴퓨터 부품의 최적교체주기에 대한 수학적 모델을 유도했고, 해석적으로 최적교체주기를 계산했다. 우리는 그결과를 현재 월성 원자력 발전소에서 쓰이는 방법과 비교했다. 월성에서 사용되는 방법은 수학적 분석 방법이 아닌 경험적 지식을 토대로 한것이다. 결과적으로 해석적으로 얻어진 최적 교체주기와 월성에서 사용되는 교체주기와는 약간의 차이를 보이고 있다.

Keywords