중첩생산을 고려한 개별생산방식의 일정계획에 관한 연구

A Study on Job Shop Scheduling with Overlapping Production

  • 발행 : 1993.11.01

초록

The algorithm of Giffler and Thompson is modified for solving job shop scheduling problems related to the overlapping production The start-lag and stop-lag are also applied New priority rules for the overlapping production are proposed and the efficiency of them is compared with that of the classical priority rules.

키워드