A Study on the Optimal Design of the Arterial in Pusan Area Using the TSM Techniques

TSM기법을 고려한 부산지역 간선도로의 최적설계에 관한 연구

  • Published : 1993.12.01

Abstract

In this study for relieving traffic congestion on the main arterial in Pusan using TSM Techniques, the travel system, roadway system and signal system analyses were dine. Through these above analyses, it was shown that the peak-time periods on the main arterial were shaped between 10 : 00 and 11 : 00 in the morning and between 15 : 00 and 16 : 00 in the afternoon for the business and shopping trips. Especially, there appeared to be about 23% reduction in the average delay when roadway system management including left-turn links increased were done, about 29% reduction in the average delay when signal system management including the signal phases and timings readjusted were conducted, and about 48% reduction in average delay when roadway system and signal system management were taken into consideration simultaneously. Based upon these results, it was concluded that there might be considerably better results in the average delay if the progressive signal system analyses on the arterial were applied with the land and road widths balanced, the difference on the turning vehicles and mid-block volumes readjusted, and roadside parking traffic prohibited.

Keywords