Abstract
A hydrological method is performed to determine the critical duration of design rainfall for the design of storm sewer in Seoul. To seize the effect of the duration and the temporal distribution of the rainfall to the peak discharge of the storm sewer, the Huff's quartile method is used as a temporal pattern for the design rainfall of any durations (9 cases for 20-240 min.) with 10 years return period. The critical duration of design rainfall is determined as the duration which maximizes the peak discharge. This study is applied to 18 urban drainage systems in Seoul. The ILLUDAS model is applied to runoff analysis, and the result shows that the duration which maximizes peak discharge is 30, 60 minutes generally. The relation diagram between peak discharge for the critical duration and watershed area is prepared for the design of storm sewer.
본 연구는 하수관거 설계시, 계획강우의 임계지속기간을 결정하기 위한 것으로서, 지속기간내의 시간적 강우분포형은 Huff의 4분위법에 의하였으며, 20분~240분의 9개의 지속기간을 10년 빈도강우에 대하여 검토하였다. 본 연구에서는 서울시 관내의 18개 유수지 배수구역을 대상으로 해석을 시도하였으며, 유출해석을 위하여 ILLUDAS 모형을 이용하였다. 하수관거의 설계수문량 기준이 되는 첨두유출량을 최대로 발생시키는 계획강우의 임계지속기간은 대체로 30,60분으로 판단되었다. 계획강우의 시간적 분포형별로 임계지속기간을 설정할 수 있도록 첨두유량-유역면적-임계지속기간의 관계도를 제시하였다.