Journal of environmental and Sanitary engineering (환경위생공학)
- Volume 8 Issue 1
- /
- Pages.107-116
- /
- 1993
- /
- 2005-5889(pISSN)
Substrate Removal Condition in Activated Sludge Process of Wastewater from Acetaldehyde Manufacturing Plant
Acetaldehyde폐수의 활성오이법에 의한 기질제거조건
Abstract
This study is conducted to investigate treatability by activated sludge process for wastewater from acetaldehyde manufacturing plant. The optimum hydraulic retention time in aeration tank for removal of high strength substrate were measured. The removal efficiency were checked out by hydraulic retention time : 35hr., 40hr. and 45hr., respectively.
Keywords