Explosives and Blasting (화약ㆍ발파)
- Volume 10 Issue 4
- /
- Pages.6-18
- /
- 1992
- /
- 1229-9073(pISSN)
On the Cautions blasting work of pier foundation in the PALDANG Bridge
팔당대교 교각 기초발파작업
Abstract
This Test Blasting aims to dig pier foundation in the water, therefore the Caps & Powder needs 5-20% more Than the amount of ground blasting works. It results in the Dimension of water blasting standardization This project is Contracted with th office of HAM River Development of Kyunggi province.
Keywords