Expert System for Intelligent Control-Based Job Scheduling in FMS

FMS 에서의 지능제어형 생산계획을 위한 전문가 시스템

  • 정현호 (금성정보기기연구소) ;
  • 이창훈 (연세대 공대 전기공학과) ;
  • 서기성 (연세대 공대 전기공학과) ;
  • 우광방 (연세대 공대 전기공학과)
  • Published : 1990.05.01

Abstract

This paper describes an intelligent control-based job scheduler, named ESIJOBS, for flexible manufacturing system. In order to construct rulebase of this system, traditional rules of job scheduling in FMS are examined and evaluated. This result and the repetitional simulations with graphic monitoring system are used to form the rulebase of ESIJOBS, which is composed of three parts:six part selection rules, four machine center selection rules, and twenty-one metarules. Appropriate scheduling rule sets are selected by this rulebase and manufacturing system status. The performances of all simulations are affected by random breakdowns of major FMS components during each simulation. Six criteria are used to evaluate the performance of each scheduling. The two modes of ESIJOBS are simulated and compared with combinational 24 rule-set simulations. In this comparison ESIJOBS dominated the other rule-set simulations and showed the most excellent performance particularly in three criteria.

Keywords