A Reliability Analysis of HHSIS of KNU 5,6,7 and 8 Following the Removal of s-signal from Charging/safety Injection Pump Mini-flow Line Valves

충전/안전주입 펌프 순환배관의 안전주입신호 제거에 따른 원자력 5,6,7,8 호기의 고압안전주입계통의 신뢰도 분석

  • Published : 1988.03.01

Abstract

The objective of this study is to evaluate the reliability of the High Head Safety Injection System (HHIS) of KNU 5, 6, 7 and 8 following the removal of safety injection signal (s-signal) from the mini-flow bypass line valves of charging/safety injection pumps. The unavailability of HHSIS and the rupture probability of a charging/safety injection pump have been computed for two different cases; with s-signal on and removed. The results show that when the s-signal is removed from the mini-flow bypass line valves, the unavailability of HHSIS slightly increases while the rupture probability of a charging/safety injection pump is significantly reduced. Hence, based upon the results of this study we conclude that it is more reasonable to remove the s-signal from the mini-flow bypass line valves of KNU 5, 6, 7 and 8 in the normal plant operation. And to improve the availability of HHSIS, the modification of operational procedures and the emphasis on operator training are recommended.

본 연구의 목적은 충전/안전주입 펌프 최소순환관으로부터 안전주입신호(s-신호)를제거 함에 따른 원자력 5,6,7,8호기의 고압안전주입계통(HHSIS)의 신뢰도를 분석, 평가하는 것이다. 계산은 s-신호를 제거한 경우와 제거하지 않은 경우에 대하여 각각 수행되었다. 각 경우에 대하여 s-신호 발생시 고압안전주입계통의 이용불능도와 충전/안전주입 펌프의 파손확률이 계산되었다. 계산결과에 따르면, s-신호를 제거함에 따라 고압안전주입계통의 이용불능도는 미세하게 증가하였으며 반면에 충전/안전주입 펌프의 파손확률은 크게 감소하였다. 따라서 여러가지 측면에서 충전/안전주입 펌프의 최소순환관으로부터 s-신호를 제거하고 운전하는 것이 합당하다는 것이 밝혀졌으며, 고압안전주입계통의 이용불능도를 줄이기 위하여 운전절차를 개선하고 운전원의 훈련 및 교육을 강화할 것을 추천한다.

Keywords