The Transactions of the Korean Institute of Electrical Engineers (대한전기학회논문지)
- Volume 35 Issue 6
- /
- Pages.237-245
- /
- 1986
- /
- 0254-4172(pISSN)
Anticipatory Generation Control of Fossil Power Plant for Large and Rapid Recurring Load Fluctuations
부하변동이 심한 화력발전소의 예상 발전 제어
Abstract
Most fossil steam generating units are currently being designed for base load operation and are not therefore generally suitable for large and rapid recurring load fluctuations. In particular the control systems adopted for such units are not adequate for the severe recurrent load fluctuations. In particular the control systems adopted for such units are not adequate for the severe recurrent load fluctuations that are expected by the plant supplying the power requirements of the electric are furnaces and rolling mills employed by the steel industry. This paper presents a feasible Anticipatory Control Algorithm which ensures that the fossil fuel fired plant can meet such severe requirements from the control point of view. Details of such a control algorithm and its dynamic simulation on a sample power system are also presented.
대부분 화력 발전소는 기저부하(base load)운전용으로 설계되어 있어 극심한 부하 변동이 계속되는 부하에 대하여는 일반적으로 적합하지 못하다. 특히 전기로와 압연기가 설치된 제철소에 전력을 공급하는 발전소의 경우 연속적인 심한 부하변동으로 일반적으로 발전소 제어 시스템으로는 적당치 않다. 이 논문에서는 이와 같이 연속적으로 급변하는 부하에 대응할 수 있는 화력 발전소 예상 제어 앨고리즘을 제시 하였다. 상헤한 제어 앨고리즘과 모델 계통에 대한 사례 연구를 첨부하였다.
Keywords