A Fast Approximation Algorithm for Calculating the Operating Cost Considering the Transmission Line Outage
선로사고를 고려한 간략화 운전비계산에 관한 연구
Abstract
In this paper, operation cost of the system is calculated by the probabilistic simulation method. And it is proved that only 20 iterative simulations are enough to get the result obtain by the Monte Carlo simulation method which requires more than 1000 iterative simulations. In the probabilistic simulation method we use the ranking of line contingency which is derived from the line countingency selection algorithm proposed in (2). In using this method the nature of the sparsity of the power system is used.