연구개발 프로젝트를 위한 새로운 GERT평가모델
An Advanced GERT Evaluation Model for Research and Development
초록
Research and Development has a property that involves uncertainity and risk in itself. Therefore, in order to scheduling of R & D activity, it Is needed of a certain probabilistic network technique with due regard to feedback process used to occur in the R & D proceeding. It is GERT that was developed as the need arises . In this study, the network structure of GERT-I and GERT-II was combined and then simulation analysis was used to it. According to that analysis , an advanced GERT model which covers the following stochastic problems was examined. 1 Evaluating success feasibility under the complex condition (time and cost). 2 Selecting acceptance range for the worst. 3. Selecting optimum path on basis of time, cost and success. 4. Evaluating project utility among the project alternatives. It is for managing R&D projects more effectively.
키워드