Research on Mechanized Upland Reclamation Works(II) -Analysis of the working Characteristics of Man-power Minimum.-

야산 기계화개간 공법에 관한 연구(II) -개간공사에 있어서 인력작업의 특성분석-

  • 류한열 (서울대학교 농과대학 농공학과) ;
  • 정하우박승우 (서울대학교 농과대학 농공학과 서울대학교 농과대학 농공학과)
  • Published : 1975.12.01

Abstract

In order primarily to establish the working stages in the reclamation works and to- analyze the working characteristics of man-power, the investigations for construction_ works were conducted on Echeon Largescale Reclamation Project Area. The results are summarized as follows; 1. The working chart on reclamation by man-power is Fig.IV-1. 2. The. ratio of actual working time to total varied with the total times, being 1.0 for less than 4 hours but about 0.9-0.83 for more than 5 hours. 3. Felling operations can be classified into three stages as truck-cutting, branch- cutting, and binding-up, of which results are in Table IV-2. The larger the diameter of stands, the more times for both the cutting operations are, but the moving time is constant to be about 15 sec. 4. Stumping and clearing works have the results prepared in Table IV-3. Between the stumping time and the diameter of stands d, there show highly significant positive correlations, expressed as t=2.212d -4.792. The more the ratio of small diameters to total, the more hastily the total hourly working results of each person are increased. 5. Working results for constructing drainage facilities and ridges are in Table IV-5. The labours for placing patches of grass are required more than twice or three times as much as those are showed in the established standards, and such the different results imply more investigation to be necessary. 6. Table IV-6 sholvs the results for plowing andh arrowing, that are less amount thant the standards. Therefore, more inverestigation should be prepared.

Keywords