전기의세계
- Volume 21 Issue 2
- /
- Pages.34-40
- /
- 1972
- /
- 1598-4613(pISSN)
Determination of optimal unit commitment and load dispatch for thermal power system by DP method
DP법에 의한 화력계통의 최적병렬치수 결정 및 부하배분
Abstract
This paper describes the problem of the shortange-economic-scheduling for unit commitment and load dispatching in thermal power system. For economic operation of thermal system, the optimum time of startup and shoutdown of the generating unit must be determined so as to minimize the sum of generating and starting fuel cost over a given period. The above problems are analyzed for the purpose of the application of Dynamic Programing Method. Also the technique of Dynamic Programming is applied to the problems. For the illustative purpose, a case study was made on a model system composed of eight units and the computing time was about 190 seconds by IBM 360-40 system. Therefore, one can utilize this suggested method on any of the practical power systems.
Keywords