전기의세계
- 제17권3호
- /
- Pages.57-61
- /
- 1968
- /
- 1598-4613(pISSN)
154KV계 직접접지시의 절연협조
Study on insulation coordination of 154KV solidly grounded system
초록
Limitation to Peterson coil grounded operation of 154KV system began to develop with the growth of system as to voltage and system cost. Therefore, 154KV system is going to be grounded solidly from November this year. This study shows the insulation coordination of solidly ground system, such as the selection of a suitable lightening arrester, determination of transmission line insulation and Basic Insulation Level of station equipment.
키워드