시뮬레이션 기법 기반 공정계획 수립을 위한 데이터베이스 구축 방법론

Database establishment method for process scheduling by means of simulation

  • 발행 : 2022.04.20

초록

The domestic process planning generally relies on calculations based on the construction-standard-production-rate. This method requires trial and error practice during the construction phase to deduce the optimized equipment combination for time and cost. Trial and error during construction can lead to cost overruns and schedule delays. Accordingly, this paper suggests an advanced method for establishing a productivity database based on combinations of equipment and also considering site conditions in order to reduce the timely effort for deducing the optimized equipment combination. For this purpose DES (Discrete Event Simulation) model was developed based on the information provided in the construction-standard-production-rate.

키워드

과제정보

본 논문은 한국연구재단의 지원(과제번호 2021R1A2C1007467)과 국토교통부/국토교통과학기술진흥원이 시행, 한국도로공사가 총괄하는 "스마트건설기술개발 국가R&D사업(과제번호 21SMIP-A158708-02)"의 지원으로 수행된 연구임을 밝히며 이에 감사를 드립니다.