Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2020.06a
- /
- Pages.161-162
- /
- 2020
A Study on the Cause and Reduction of Cracks in the Wall Connecting the Underground Parking Lot and the Apartment
지하주차장과 아파트 연결 벽체의 균열 원인 분석 및 저감방안 연구
Abstract
Cracks are caused by drying shrinkage between the upper part of the underground parking lot and the apartment wall. As a result of the investigation, the distance between the apartment and the apartment is more than 45m, and the top slab of the underground parking lot is usually flat when there is not with steps. Therefore, the crack occurs more when the underground parking lot is a PC slab than a RC slab. In this study, the reduction of cracks was conducted by extending the slab, expanding the beam size, increasing the wall thickness, and installing a delay joint on slab. In each case, a finite element analysis was performed to examine the crack reduction method.