Semi-Rig, Introduction of Hole Verification Procedure

Semi- Rig, Hole Verification Procedure 소개

  • Lee, Seung-hun (Structure Design Dep't, Hyundai Samho Heavy Industries Co., Ltd.) ;
  • Lee, Seung-hun (Structure Design Dep't, Hyundai Samho Heavy Industries Co., Ltd.) ;
  • Kang, Young-gu (Structure Design Dep't, Hyundai Samho Heavy Industries Co., Ltd.) ;
  • Lee, Joon-hyuk (Structure Design Dep't, Hyundai Samho Heavy Industries Co., Ltd.)
  • 이승훈 (현대삼호중공업(주) 구조설계부) ;
  • 이승훈 (현대삼호중공업(주) 구조설계부) ;
  • 강용구 (현대삼호중공업(주) 구조설계부) ;
  • 이준혁 (현대삼호중공업(주) 구조설계부)
  • Published : 2017.10.30

Abstract

Due to the nature of semi-submergible drilling rig, various equipments are arranged in a limited space, and therefore the many types of outfitting holes passing through the hull structure are densely arranged and that is required the detailed structural strength evaluation in terms of ULS and FLS by class or client. Particularly, semi-submergible drilling rig has a variety of global load which affects the structure strength around holes compared to general commercial ship, and its response of stress is also complicated, so it is difficult to carry out the prediction design of structural strength evaluation and reinforcement. In this regard, this paper presents a case study on the evaluation of structural strength for the various holes and large openings of semi-submergible drilling rig conducted by our company, as well as an established hole verification procedure.

Keywords