Quality Management of Exposed Concrete at Construction Phase

시공단계 노출 콘크리트 품질관리 방안

  • 김태훈 ((주)건축사사무소 건원엔지니어링)
  • Published : 2016.05.19

Abstract

To express the original texture of the concrete, exposed concrete finishing technique has been applied in many buildings. However, it is likely to cause quality problems after construction is completed. In addition, because of costs and time issues, reconstruction and maintenance works are difficult and ineffective. Therefore, step-by-step proactive quality management based on sufficient consensus among participants(client, designer, contractor) is very importatnt. This study analyzed factors causing low quality exposed concrete and quality contol points applied to 'A' headquarter construction project.

Keywords