최적 토량배분 계획을 위한 의사결정 모델

Decision Making Model for Optimal Earthwork Allocation Planning

  • 곽한성 (경북대학교 건설환경에너지공학부) ;
  • 서병욱 (경북대학교 건설환경에너지공학부) ;
  • 이동은 (경북대학교 건축학부)
  • 발행 : 2016.05.19

초록

This paper presents a mathematical model for optimizing earthwork allocation plan that minimizes earthwork cost. The model takes into account operational constraints in the real-world earthwork such as material-type (i.e., quality level of material) and quantities excavated from cut-sections, required quality of material and quantities for each embankment layer, top-down cutting and bottom-up filling constraints, and allocation orders. These constraints are successfully handled by assuming the rock-earth material as the three dimensional (3D) blocks. The study is of value to project scheduler because the model identifies the optimal earth allocation plan (i.e., haul direction (cut and fill pairs), quantities of soil, type of material, and order of allocations) expeditiously and is developed as an automated system for usability. It is also relevant to estimator in that it computes more realistic earthworks costs estimation. The economic impact and validity of the mathematical model was confirmed by performing test cases.

키워드