한국건축시공학회:학술대회논문집 (Proceedings of the Korean Institute of Building Construction Conference)
- 한국건축시공학회 2015년도 춘계 학술논문 발표대회
- /
- Pages.190-191
- /
- 2015
초고층 아웃리거층 골조공사의 주요 공기지연 요인 도출
The study on the Derivation of major delay factors in Outrigger Framework of Tall Building
초록
Construction delays occur frequently in outrigger framework of tall buildings due to the unexpected conditions and lack of experience. However, delay factors of the outrigger framework has not been managed efficiently. Therefore, the systematic management is needed by perceiving possible delay factors before constructing management system. In this study, the major delay factors of outrigger framework are conducted to derive by using the Importance Performance Analysis(IPA). It is expected that the results of this study are utilized for planning of systematic scheduling in outrigger framework of tall building.
키워드