한국건축시공학회:학술대회논문집 (Proceedings of the Korean Institute of Building Construction Conference)
- 한국건축시공학회 2015년도 춘계 학술논문 발표대회
- /
- Pages.138-139
- /
- 2015
기초공사 천공기계 시간당작업량 산정 개선방안
Improvement on the estimation of workable-quantity per unit time for boring machine
초록
Human productivity of Boring Machine for stack is provided but not its hourly workable quantity(Q-value) in the Equipment ownership cost and expenses section of the Poom-Same that is used for construction cost estimation of public sectors in Korea, which leads to less realistic and subjective estimation for the works. The optimized Q-value of the machine is proposed as a result of thorough investigation into many of its operations.