A Study on the Hindrance Factors of the Productivity in Design VE Phase

설계 VE단계에서 발생하는 생산성 저해요소 분석 - '00공사 사옥 신축공사' 사례를 중심으로 -

  • 최지혜 (한양대학교 건축공학과) ;
  • 상준 (한양대학교 건축환경공학과) ;
  • 김반석 (한양대학교 건축환경공학과) ;
  • 김주형 (한양대학교 건축공학과) ;
  • 김재준 (한양대학교 건축공학과)
  • Published : 2013.05.09

Abstract

After the introduction of the design VE system in 1990s, based on the legal system has made a rapid growth. Also It is evaluated as qualitative growth. Despite this growth, VE effort can cause the occurrence of the risk. In this paper carried out to hindrance factor that decrease the productivity in VE phase for strategy to improve the utilization of basic data.