베이시안 접근법을 이용한 생산성 관리 방안 제시

Productivity management methodology development using Bayesian Approach

  • 고용호 (인하대학교 건축공학과) ;
  • 이태희 (인하대학교 건축공학과) ;
  • 한승우 (인하대학교 건축공학과)
  • 발행 : 2013.05.09

초록

Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

키워드