Linked-Data based Construction Raw Data Format

LINKED-DATA 방식을 이용한 건설원천데이터 포맷

  • 최병일 (인하대학교 건축공학과) ;
  • 이은지 (인하대학교 건축공학과) ;
  • 고용호 (인하대학교 건축공학과) ;
  • 한승우 (인하대학교 건축공학과)
  • Published : 2013.11.15

Abstract

Construction data is one of the most important resources in a construction project. The construction data is generally stored in the PMIS. However, it has been analyzed that the PMIS revealed limitations in suggesting valuable information by analyzing the data. In order to overcome such limitations, the linked-data methodology used in big data management has been studied. The purpose of this study is to suggest a methodology that improves the system by developing a more effective data collection and management model using the linked-data format.

Keywords