A Case study for minimizing scale of LRT stations constructed underground

지하 경량전철의 정거장 규모조정에 관한 사례연구 (우이~신설 경량전철 중심으로)

  • 진재섭 (서울시청 도시기반시설본부 경전철설계과) ;
  • 이승석 (서울시청 도시기반시설본부 경전철설계과) ;
  • 오태상 (서울시청 도시기반시설본부 도시철도설계부) ;
  • 신한철 (서울시청 도시기반시설본부 도시철도)
  • Published : 2011.10.20

Abstract

Seoul Metropolitan Government has performed alternative transit system, light rail transit(LRT), for settling the problems of urban public transit system based on conventional bus service and heavy rail transit(HRT). LRT projects of total 8 lines(about 73.6km), including Ui-Sinseol line, have been planned as Build-Transfer-Operate(BTO) projects. For the first LRT, Ui-Sinseol line, however, design of structure had met standard for design of HRT, because of no domestic design code for LRT when participates of Ui-Sinseol project submitted the design proposal. This case study reports a successful example of LRT design minimizing the scale of stations designed in base of HRT code. The problems, like oversized structures compared with LRT vehicles, excessive costs for construction, had been resolved through negotiations with the participates of Ui-Sinseol line. Result suggests that present and future costs for construction and maintenance of the LRT projects in Seoul be considerably reduced in advance.

Keywords