Experimental Study on the Connection between RC Footing and Steel Pile according to Rail loads

철도하중을 고려한 기초구조물과 강관말뚝 연결부 거동에 관한 실험적 연구

  • 김정성 (서울과학기술대학교 철도전문대학원 철도건설공학과(쌍용건설(주))) ;
  • 김대상 (한국철도기술연구원 고속철도연구본부) ;
  • 조국환 (서울과학기술대학교 철도전문대학원 철도건설공학과)
  • Published : 2011.10.20

Abstract

As the connection between spread footing and pile is very important structural connection, it acts as the inter-loading medium to transfer the rail loads applied by superstructure to ground through the body pile of foundation. The experimental study is the method how to reinforce the pile cap between steel pile and footing utilizing perfobond plate with protruding keys. It were experimented on the compression punching tests and bending moment tests against the vertical loading and horizontal loadings acting on head of steel tube pipe. As a result, the tension capacity of the perfobond plate exhibited the superior performance due to the interlocking or dowel effects by the sheared keys of perfobond plate, and there were showing the sufficient strength and ductile capacity against the bending moment of horizontal loading tests. Therefore, it is judged that "the embedded method of perfobond plate in pile cap and footing" which is utilizing the shear connection of perfobond plate with protruding keys has a sufficient structural stability enough to be replaced with the current specification of reinforced method of pile cap with vertically deformed rebar against the vertical compression loads and bending moments that are able to occur in the combination structure of steel pile and the footing foundation.

Keywords