전수명주기를 고려한 PMIS개발 방안

A Development Plan for PMIS based on Total Life Cycle

  • 발행 : 2011.10.20

초록

Recently, the demand regarding reliability and safety of the railroad are increased as built to high-speed railway and Driverless LRT systems. Accordingly, effective management of construction projects is being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. Therefore, this study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.