장변위공내재하시험기를 이용한 철도교 기초의 P-y곡선에 관한 연구

P-y Curves from Large Displacement Borehole Testmeter for Railway Bridge Foundation

  • 류창열 (서울과학기술대학교 철도전문대학원 철도건설공학과) ;
  • 이슬 (서울과학기술대학교 건설공학과) ;
  • 김대상 (한국철도기술연구원 고속철도연구본부) ;
  • 조국환 (서울과학기술대학교 철도전문대학원 철도건설공학과)
  • 발행 : 2011.10.20

초록

The lateral stability of bridge foundations against train moving load, emergency stopping load, earthquakes, and so on is very important for a railway bridge foundation. A borehole test is much more accurate than laboratory tests since it is possible to minimize the disturbance of ground conditions on the test site. The representative borehole test methods are Dilatometer, Pressuremeter and Lateral Load Tester, which usually provide force-resistance characteristics in elastic range. In order to estimate P-y curves using those methods, the non-linear characteristics of soil which is one of the most important characteristics of the soil cannot be obtained. Therefore, P-y curves are estimated usually using elastic modulus ($E_O$, $E_R$) of lateral pressure-deformation ratio obtained within the range of elastic behavior. Even though the pile foundation is designed using borehole tests in field to increase design accuracy, it is necessary to use a higher safety factor to improve the reliability of the design. A Large Displacement Borehole Testmeter(LDBT) is developed to measure nonlinear characteristics of the soil in this study. P-y curves can be directly achieved from the developed equipment. Comparisons between measured P-y curves the LDBT developed equipment, theoretical methods based on geotechnical investigations, and back-calculated P-y curves from field tests are shown in this paper. The research result shows that the measured P-y curves using LDBT can be properly matched with back-calculated P-y curves from filed tests by applying scale effects for sand and clay, respectively.

키워드