Application of 5678SMRT Real-time Monitoring system

도시철도 실시간 모니터링 시스템 적용 사례

  • 윤재관 (서울특별시도시철도공사) ;
  • 박종헌 (서울특별시도시철도공사) ;
  • 김기춘 (서울특별시도시철도공사)
  • Published : 2011.10.20

Abstract

5678SMRT has installed various sensor for operating conditions(field of electric, facilities, signal, communication equipment and track) and environment of Every Function Room for remotely detecting and monitoring. Installed sound sensor for analyzed after remotely heard the noise of every equipment at Every Function Room and temperature sensor for check the temperature condition of Every Function Room. Additional installed voltage sensor in signal equipment room for monitoring RF track-circuit's voltage condition. Installed displacement sensor at The Chungdam bridge's railway for measuring and monitoring track displacement caused by temperature change and Pan/Tilt camera at sub-station and drainage for remotely field monitoring. Installed sensor for each equipment's operating condition and failure at Every Function Room then periodic check of workforce turned to around-the-clock surveillance by sensor therefore improvement of operating equipment. SMRT is lots of prevent a failure by Immediately detect of precondition of equipment failure by analyzed the sensor data. If the occurrence of an failure, become detected Immediately so possibility correct diagnosis and order by remotely field check by installed camera and sound sensor at field.

Keywords