한국철도학회:학술대회논문집 (Proceedings of the KSR Conference)
- 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
- /
- Pages.268-274
- /
- 2011
크리너 작업구간 선로안정화 상태평가에 관한 연구
A Study on the Assessment of Track Stabilization on Ballast Cleaning work site
초록
In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.
키워드