In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

키워드