Initial Investment Cost Analysis of Facilities of B2S Track System

B2S궤도시스템의 초기 시설 투입비용 분석

  • Published : 2011.05.26

Abstract

B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

Keywords