VIRTUAL CONSTRUCTION OF TRANSFER FLOORS IN REINFORCED CONCRETE BUILDING USING BIM

  • Kwangho So (Daewoo E&C Co. Ltd.) ;
  • Bohwan Oh (Daewoo Institute of Construction Technology) ;
  • Yongjik Lee (Daewoo Institute of Construction Technology) ;
  • Hyungeun Lee (Daewoo Institute of Construction Technology) ;
  • Taehun Ha (Daewoo Institute of Construction Technology)
  • Published : 2011.02.16

Abstract

Building Information Modeling (BIM) is being widely spread in AEC industry worldwide and also in South Korea. Although the creation of digital model is better to be started at design stage, it can also improve the productivity of construction by simulating the actual construction process and environment. This paper presents application of BIM-based simulations related with design changes to transfer floors in 58-storey reinforced concrete office building. Transfer floor is not only a structurally important part of the building but also a challenging part of the actual construction in terms of sequence and period due to the complexity of the work. Preconstruction of rebar, mechanical, and plumbing is performed to review the construction drawings and to perform clash detection. Each item of application is evaluated for its effectiveness on actual construction and for the development potential.

Keywords