한국지반공학회:학술대회논문집 (Proceedings of the Korean Geotechical Society Conference)
- 한국지반공학회 2010년도 춘계 학술발표회
- /
- Pages.1302-1308
- /
- 2010
사면녹화 보강토공법의 보강재길이 산정에 관한 연구
The Computation of Reinforcement Length of Afforestation Slope
- Park, Sik-Choon (Dept. of Civil Engineering, Univ. of Changwon) ;
- Nam, Kwang-On (The president of Kun An Engineering) ;
- Kim, Jong-Hwan (Dept. of Civil Engineering, Univ. of Changwon) ;
- Lee, Soo-Yang (Dept. of Civil Engineering, Univ. of Changwon)
- 발행 : 2010.03.25
초록
This study the change of the safety factor before and after the reinforcement were compared by performing the parameter research based on the limit equilibrium analysis regarding the same cross section after carrying out the safety factor before the reinforcement on the virtual section in order to observe the change of the safety factor of the slop reinforced with the slope planting reinforced earth, and the variation of the safety factor according to the increase of the length of the reinforcement materials and the change of the slope height was analyzed. As the result, the reinforcement effect was insignificant at no more than 0.6 of L/H, the reinforcement length ratio when the reinforcement length was increased, as the increase of the safety factor was slow comparing with the non-reinforced slope. At 3.0m of the slope height, reinforcement on the slope is not necessary, and at 3.0m to 5.0m of the slope height, the inclination was not influencing at no less than 0.6 of L/H. At 5.0m to 9.0m of the slope height, the safety factor was mostly secured on the slope at 0.8 of L/H and the over-reinforced slope appeared at no less than 1.0 of L/H. Also, the safety factor increased as the slope height increases and the slope gets steeper till 0.8 of L/H, but the slope steepness affects more on the increase of the safety factor than the reinforcement material, as the reinforcing force by the reinforcement material became steady.