Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2009.11a
- /
- Pages.261-264
- /
- 2009
Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.
WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구
Abstract
Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.