Work Time of Basement Composite Wall Form Assembly by Work Time Analysis

작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구

  • 허경무 (경기대학교 건축공학전공) ;
  • 김명현 (경기대학교 건축공학전공) ;
  • 김태희 (목포대학교 건축공학과) ;
  • 김재엽 (충주대학교 건축공학과) ;
  • 김광희 (경기대학교 건축공학과)
  • Published : 2009.11.14

Abstract

Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

Keywords