A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi (Heerim Architects & Planners Co., Ltd) ;
  • Su-Man Choi (Heerim Architects & Planners Co., Ltd) ;
  • Jai-Dong Koo (Korea Institute of Construction Technology(KICT)) ;
  • Nam-Gi Lim (Department of Architectural Engineering, Tong-myong University) ;
  • Sang-Beom Lee (Department of Architectural Engineering, Dong-eui University)
  • 발행 : 2009.05.27

초록

Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

키워드