International conference on construction engineering and project management (국제학술발표논문집)
- 2009.05a
- /
- Pages.1340-1345
- /
- 2009
- /
- 2508-9048(eISSN)
INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS
- In-Su Jung (Korea Institute of Construction Technology) ;
- Jin-Uk Kim (Korea Institute of Construction Technology) ;
- Chan-Sik Lee (Incheon University)
- Published : 2009.05.27
Abstract
Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.