Storm Water Logging Analysis and Pre-warning System Construction in Beijing City

  • Yuan, Ximin (Dept. of Water Hazard Research, Institute of Water Resources and Hydropower Research)
  • Published : 2009.05.21

Abstract

In this paper the analysis of natural cause of Beijing Storm inundation and the effect of the human activities has been taken. Flood risk can hardly be eliminated solely by projects. Pre-warning system established is an efficient measure to minimize the influence of flood. Several main functions of this system and their examples are described in the paper, such as: monitoring, forecast, scheme, warning, dynamic decision-making and information publication.

Keywords