한국철도학회:학술대회논문집 (Proceedings of the KSR Conference)
- 한국철도학회 2009년도 춘계학술대회 논문집
- /
- Pages.1179-1186
- /
- 2009
고속철도차량 부품의 TBO 산정을 위한 분석 사례
High-speed Train(KTX) parts study case to compute TBO
초록
The high-speed train(KTX) was operated in domestic since 2004 and 4years have been passed since then. At the beginning most of the KTX component maintenance period was followed by the France SNCF. It was settled by the TBO(Time Between Overhauls). But the environment and operation condition are different form each other, so the TBO maintenance period can be different in some component. Therefore new TBO is necessary based on our own circumstances. This paper introduces failure analysis case on some components to set TBO in domestic. KTX-RCM(Reliability Centered Maintenance System), MICS(Maintenance Information Computer System) and KOVIS(KORAIL ERP System) Data was investigated.
키워드