Estimation for Failure Rate of Railway Power Facility and Determination of Maintenance Priority Order using Fuzzy Theory and Expert System
퍼지이론과 전문가 시스템을 이용한 철도 전력 설비의 고장률 평가와 유지보수 우선순위의 결정
- Published : 2009.05.21
Abstract
As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.
Keywords